He Ara Kotahi Pathway

Project name: He Ara Kotahi Pathway (Palmerston North and Linton section)

Project location: Palmerston North, Manuwatu

Timeframe: Completed June 2019

Description of the project, and Frame’s role

Palmerston North City Council engaged Frame Group to design and contract management the construction of new section of part of the He Ara Kotahi pathway a 2.9 km long shared cycling and walking trail between Dairy Farm Road in the Massey University Farm and Bells Road at Linton Camp in Palmerston North, Manawatu.  

Project features:

  • Design of approximately 390m of 3m wide of track.
  • Design of approximately 3500m of 2.5m wide of track.
  • Turitea bridge super structure: 36m long× 3.0m wide glulam bridge.
  • Farm track overbridge superstructure: 36m long×2.5m wide glulam timber bridge.
  • Greenwoods bridge:  10m long×2.5m wide glulam timber bridge.
  • Design of approximately 70m of timber boardwalk.
  • Kahuterawa Bridge: 45m long x 1.5m wide timber suspension bridge.

Turitea Bridge and Farm Track Overbridge substructure designed by OPUS International Consultants.

Scroll to Top