Roberta Reserve Bridge

Project name: Roberta Reserve Bridge

Project location: Glendowie, Auckland

Timeframe: Completed 2016

Description of the project, and Frame’s role

Frame Group was engaged by Auckland Council to design, and contract manage the construction of a replacement bridge at the South-eastern corner of Roberta Reserve.  

Frame Group worked alongside TIKAcreative who assisted with the creative elements of the barrier pattern and Carved Pou design.

Scroll to Top