He Ara Kotahi Pathway (Palmerston North and Linton section)
Project name
He Ara Kotahi Pathway (Palmerston North and Linton section)
Client name
Palmerston North City Council
Project location
Palmerston North, Manuwatu
Timeframe
Completed June 2019
Contractor
Fulton Hogan Limited
Palmerston North City Council engaged Frame Group to design and contract manage the construction of new section of the He Ara Kotahi pathway a 2.9 km long shared cycling and walking trail between Dairy Farm Road in the Massey University Farm and Bells Road at Linton Camp in Palmerston North, Manawatu.
Project features:
Design of approximately 390m of 3m wide of track
Design of approximately 3.5km of 2.5m wide of track
Turitea bridge super structure: 36m long× 3.0m wide glulam bridge
Farm track overbridge superstructure: 36m long×2.5m wide glulam timber bridge
Greenwoods bridge: 10m long×2.5m wide glulam timber bridge
Design of approximately 70m of timber boardwalk
Kahuterawa Bridge: 45m long x 1.5m wide timber suspension bridge
Frame Group worked with OPUS International Consultants who designed the Turitea Bridge and Farm Track Overbridge substructure.