Roberta Reserve Bridge

Project name
Roberta Reserve Bridge

Client name
Auckland Council

Project location
Glendowie, Auckland

Timeframe
Completed 2016

Frame Group was engaged by Auckland Council to design, and contract manage the construction of a replacement bridge at the southeastern corner of Roberta Reserve.  

Frame Group worked alongside TIKAcreative who assisted with the creative elements of the barrier pattern and Carved Pou design.

 
Previous
Previous

Pukekiwiriki Pā Track Development

Next
Next

The Timber Trail